Study Builder FIELD NOTES / 01

Concept for product approval

From ethics approval to a study people can run.

One platform to turn approved research materials into a bilingual participant experience, a staff workspace, and data researchers can use.

01 / AuthorEvidence into a definition.
02 / ParticipateA distinct experience per study.
03 / OperateOne place for staff to act.

01 The opportunity

The next study should start
with what you already learned.

CodeLabLeiden already supports real research work. Today, much of what makes a study distinct still lives across code, translations, seeds and deployment decisions. Study Builder turns those lessons into repeatable capabilities.

REFERENCE STUDY / 01

EEG@Home

A study spanning the lab and home: app setup, lab visits, recurring measurements, and device return.

Staff schedulingExternal appsEquipment
Explore EEG@Home
REFERENCE STUDY / 02

Young Smartphone

A longitudinal, mobile-first study: conditional guardian consent, TapCounter setup, and two initial questionnaires.

Role-bound consentApp-code poolsLongitudinal tasks
Explore Young Smartphone

First market: bilingual behavioral and observational studies. A capability list tells a team what is configurable, what needs an integration, and what still requires specialist engineering.

02 Developer + product owner

Make the decisions
visible before launch.

Start with the approved study dossier. A developer defines the study and can use AI to help; the PO resolves gaps, reviews both languages, and approves the candidate.

Authoring workbench

TRY IT Record the missing PO decision, then inspect how it changes readiness.

03 Participant experience

Different by design.
Familiar where it matters.

Give each study its own voice, layout and artwork. The same accessible platform handles language, consent, sign-in, and what a participant can do next.

TRY IT Switch study and language. In Young consent, compare a 15-year-old and a 17-year-old. In My study, complete the two initial questionnaires.

04 Staff console

Start with the study.
See what needs attention.

One place for coordinators, research staff and finance. Each study shows the tools relevant to its work; the server enforces what each role can see and do.

Research operations

TRY IT Open the Young application, see why approval is blocked, and add a synthetic code. Switch to EEG@Home to record a device return.

05 Acceptance + release

Rehearse once.
Release what you approved.

Iterate freely in test. Rehearse a selected build in acceptance with real testers and isolated cases. Move that exact artifact to production, where the study definition is frozen.

Release control Simulation · no deployment

TRY IT Resolve the authoring decision, send the candidate to acceptance, and mark the rehearsal checks. Then test the production freeze.

06 The technical model

One platform.
Different studies.

A small compiler in front of one runtime. Start with two web apps, one transactional backend and a worker. Add capabilities when a real study needs them.

01 / HOSTING

Give the study an address.

The presentational site links out. Serve studies under a shared app address by default; prove one controlled branded participant origin if needed. Staff use one central console.

02 / TRUST

Set access at the server.

Study-scoped actions, separate finance access, and recorded consent. Start external pilots in isolated institutional deployments. A hostname is not a data boundary.

03 / RESEARCH

Keep the data interpretable.

Stable codes, instrument versions, language and occurrence are part of the export. A signed v1 consent or response never becomes v2 evidence.

07 Pilot decision

Approve one study.
Prove the whole journey.

Start with a supported third study. Prove a second developer can author it, the PO can accept it, staff can recover from a failure, and an analyst can interpret its export.

01 / PO + RESEARCH

Pick the study.

Choose an approved bilingual protocol that adds one meaningful variation. Name the study owner and agree on the rehearsal and export criteria.

02 / ENGINEERING + OPS

Agree the first build.

One definition, one staff workspace, one accepted release, and one rehearsed exception. Expand against the EEG and Young cases after the first proof.

03 / PRODUCT + PARTNER

Test the value.

Define a paid institutional pilot, with clear support, retention, and data exit. Measure development and review time, recovery without SQL, and whether people can use the data.